Design a Dream blind production line around automated vane assembly, track installation and controlled final inspection. The equipment sequence below follows the Sunshieldorhonki catalog; prices are intentionally excluded because final tooling, voltage, guarding and automation depend on the customer’s product.
Need a production-line recommendation?
Tell us your blind type, target capacity and factory layout. Our team will recommend a practical machine configuration.
Manufacturing Process
- Prepare and cut vertical sheer-vane material.
- Load the confirmed components and settings.
- Automatically position and assemble the vane structure.
- Install tracks, controls and accessories.
- Hang the completed curtain.
- Inspect vane spacing, movement, rotation and finished dimensions.
Step 1: Core forming and assembly
Fully Automatic Dream Blind Machine
Line status: Required category-specific core machine

| Version | Catalog parameters |
|---|---|
| Catalog specification | 650 kg | 3.2 kW | 6,000 × 1,500 × 1,340 mm |
Final tooling and feed arrangement must be confirmed from the customer’s vane material, track system and sample.
Step 2: Final inspection — choose one
Single-Sided Inspection Hoist
Line status: Shared final inspection equipment

| Version | Catalog parameters |
|---|---|
| Catalog specification | 150 kg | 0.4 kW | 3,000 × 800 × 3,300 mm |
Use for vertical operation, tracking, squareness and appearance inspection.
Double-Sided Inspection Hoist
Line status: Higher-efficiency inspection alternative

| Version | Catalog parameters |
|---|---|
| Catalog specification | 250 kg | 2 kW | 3,000 × 800 × 3,300 mm |
Supports inspection from both sides; choose it instead of the single-sided hoist when workflow justifies it.
Configuration Options
| Level | Recommended scope |
|---|---|
| Essential | Dream blind automatic machine + single-sided inspection hoist |
| Recommended | Core machine + double-sided inspection hoist for a faster workflow |
| Shared-factory | Reuse the inspection hoist for roller, zebra and other finished blinds |
Quality-Control Checklist
- Consistent vane pitch and joining
- Correct track/component compatibility
- Even hanging and rotation
- Repeated full-travel cycling before packing
What We Need to Configure Your Line
Send Sunshieldorhonki your blind sample or drawings, maximum finished width and height, fabric/slat/profile materials, expected daily or monthly output, preferred automation level, workshop dimensions, power and compressed-air details, and any existing machines you want to reuse.
We will turn those inputs into a process plan, machine list and factory-layout proposal without forcing duplicate equipment.
Plan Your Blind Production Line
Get machine selection, line-layout and installation guidance for your project.
0 comments